More fixture
-
- Posts: 45
- Joined: Sat Aug 04, 2018 3:31 am
More fixture
Final, loaded up ready to weld. 1st fixture tacks all components, 2nd welds out top. 3rd welds out btm.
Manually in their shop takes 4 guys 3 days to produce 150 buckets, we did it with one guy, in a day and a half.
Manually in their shop takes 4 guys 3 days to produce 150 buckets, we did it with one guy, in a day and a half.